|
[接上页] ........................................................................................................................ 2d. Telephone No.: ................................................................................................ 3. Construction site where the percussive piling is to be carried out 3a. Full street address: ........................................................................................... ................................................................ Lot No.: .........................................3b. A plan of suitable scale preferably 1:1000 showing- (i) either the piling zone, that is, the area within which percussive piling is to take place or the actual pile locations; and (ii) the noise sensitive receivers in the area surrounding the site including domestic premises, hotels, hostels, temporary housing accommodation, hospitals, medical clinics, educational institutions, places of public worship, libraries, courts of law, performing arts centres or office buildings but excluding industrial premises.3c. If the applicant wishes the Authority to consider applying the correction for the effect of any barrier, additional cross-sectional drawings showing any substantial barrier should be submitted. 4. Detailed information regarding the application 4a. Details of any previous application for the carrying out of percussive piling in relation to the same site: Indicate by ticking in the appropriate box whether: □ No previous application has been made. If previous application has been made, indicate whether: □ The application was refused. OR□ A permit was issued.Construction noise permit No.: ................................................................... Date of expiry: ......................................................................................... 4b. Duration for which the construction noise permit is required: Duration: ................................................................... (Specify days/weeks/months) Dates: From ............................ To .................................................. (inclusive)4c. Piling method and pile type combination for which the construction noise permit is required. If applicable, reference should be made to Table 2-Source Sound Power Levels for Percussive Piling, contained in the Technical Memorandum on Noise from Percussive Piling. Piling method and pile type No. of units 5. Additional information 5a. Specify any particularly quiet percussive piling methods or any special noise control measures to be employed on site, or any other special factors or exceptional circumstances which are thought to be relevant......................................................................................................................... .............................................................................................................................. .............................................................................................................................. .............................................................................................................................. 5b. Give any additional information which is thought to be relevant to this application. .............................................................................................................................. .............................................................................................................................. .............................................................................................................................. .............................................................................................................................. Dated this ................. day of ................. 19 ........ Signed: ........................................ Applicant. Please note: 1. The applicant is advised to read the Noise Control Ordinance, the Noise Control (General) Regulations and the Technical Memorandum on Noise from Percussive Piling before submitting this application. The Authority shall be guided by the Technical Memorandum in considering an application. 2. Section 8(4) of the Ordinance provides that not later than 28 days after an application is received by the Authority, he shall issue a construction noise permit or serve on the applicant written notice of his refusal to issue the permit, and if at the end of those 28 days he has done neither of those things a permit shall be deemed to have been issued. 3. A construction noise permit that is issued in consequence of misleading, false, wrong or incomplete information furnished by an applicant in connection with the application is liable to be cancelled. 4. The fee payable on submission of this application will not be refunded. (Enacted 1989) FORM 3 [regulation 5(a)] NOISE CONTROL ORDINANCE (Chapter 400) SECTION 8(9) CONSTRUCTION NOISE PERMIT FOR THE USE OF POWERED |