第7页 CAP 520 DISCOVERY BAY TUNNEL LINK ORDINANCE

[接上页]

  (13) The Company shall not install any system for the collection of tolls unless the Commissioner has approved its design and specification.
  
  (14) The Company shall, if the Commissioner so requires, effect, at its expense, any modifications (which may include upgrading or enhancement), specified by him, to any system for the collection of tolls installed by the Company.
  
  Cap 520 s 25 Cessation of operation of Tunnel Link
  
  (1) If the Tunnel Link or any part of it remains closed for a continuous period exceeding 6 months due to the Company failing to carry out any work it is required to carry out under section 27(7) or failing to carry such works to the satisfaction of the Director of Highways or the Commissioner, as may be appropriate, the Director of Lands may issue a direction stating that the Company has failed to carry out remedial work necessary for the safety and maintenance of the tunnel area.
  
  (2) Where a direction is issued under subsection (1), the powers given to the Company by or under section 4 shall cease with effect from a date specified in the direction.
  
  Cap 520 s 26 Provision of alternate access and cessation of operation of Tunnel Link
  
  (1) If at any time during the operational period, due to the provision of other means of access between Discovery Bay and North Lantau, the Company is of the opinion that it is not useful to continue the operation of the Tunnel Link, the Company may apply to the Governor in Council for approval to cease the operation of the Tunnel Link for the time being.
  
  (2) Where the Governor in Council approves an application by the Company to cease operating the Tunnel Link, he may require the Company to take such steps as specified by him to prevent access by the public to the Tunnel Link.
  
  (3) The duty of the Company under section 19 to maintain the tunnel area to the satisfaction of the Director of Highways is not affected by any approval given under this section.
  
  (4) The Governor in Council may, with the consent of the Company or on application by the Company, withdraw any approval given under this section.
  
  (5) On a withdrawal under subsection (4), the Company shall resume the operation of the Tunnel Link.
  
  (6) Where the Company ceases the operation of the Tunnel Link under this section and it is not resumed within the period of 24 months beginning on such cessation, the powers given to the Company by or under section 4 shall cease on the expiry of that period.
  
  (7) In subsection (1) "operational period" (经营期间) means the period beginning on the date determined under section 18(1) and ending on-
  
  (a) the date specified in section 12(1); or
  
  (b) where appropriate, the expiry of the period for which the powers under section 4 are extended under section 12(5).
  
  Cap 520 s 27 Closure
  
  (1) The Tunnel Link shall not be closed for the passage of vehicles for which it may be used under this Ordinance, other than in the circumstances specified in this section.
  
  (2) A person specified in subsection (3) may require the Company to close the Tunnel Link or the Company may close the Tunnel Link if in the opinion of that person or the Company, as the case may be, such closure is necessary due to an emergency.
  
  (3) The persons referred to in subsection (2) are the Commissioner of Police, the Director of Fire Services, the Commissioner and the Director of Highways.
  
  (4) Where-
  
  (a) the Company closes the Tunnel Link under subsection (2), it shall inform the persons specified in subsection (3); and
  
  (b) any person specified in subsection (3) requires the Company to close the Tunnel Link, he shall inform the other persons specified in that section,as soon as practicable.
  
  (5) Where the Tunnel Link is closed under subsection (2)-
  
  (a) by the Company pursuant to a requirement under that subsection, the person who makes the requirement shall, as soon as he is satisfied that it is safe to reopen the Tunnel Link, require the Company to reopen it; and
  
  (b) by the Company, the Company shall reopen the Tunnel Link as soon as it is satisfied that it is safe to do so.(6) The Company-
  
  (a) may close the tunnel area or any part of it for maintenance, safety or operational reasons; and
  
  (b) shall inform the Commissioner in writing at least 14 days before the proposed date for the closure, of the reasons for such closure and the proposed date for reopening it.(7) Where it appears either to the Director of Highways or the Commissioner that the Tunnel Link should be closed in the interests of safety or for maintenance, the Director or the Commissioner, as the case may be, shall require the Company by notice in writing to close it immediately and to carry out, at its own expense, such remedial work as is specified in the notice as soon as practicable.
  
  (8) Where the Tunnel Link is closed pursuant to subsection (7), the Company shall not reopen it until the Director of Highways or the Commissioner, as the case may be, is satisfied that the work has been carried out and it is safe to reopen the Tunnel Link and notifies the Company accordingly.