|
[接上页] (b) Chai Wan and Aberdeen ....................................... (c) Village areas ........................................................ (d) Remainder of District ........................................... $10 per sq. metre per annum $5 per sq. metre per annum $2.50 per sq. metre per annum $1.00 per sq. metre per annum (L.N. 320 of 1976) 2. Kowloon ................................................................... $10 per sq. metre per annum (L.N. 320 of 1976) 3. New Kowloon- (a) West of Sha Tin Pass Road (including Hong Kong Airport) ................................................................ (b) East of Sha Tin Pass Road to Kwun Tong ............. (c) Cha Kwo Ling ..................................................... (d) Yau Tong ............................................................ (e) Lei Yue Mun ....................................................... $10 per sq. metre per annum $10 per sq. metre per annum $5 per sq. metre per annum $5 per sq. metre per annum $2.50 per sq. metre per annum (L.N. 320 of 1976) PART II SPECIAL RATES Item Purpose Fee 1. Cultivation- (a) Pleasure garden and flower growing .................. (b) Grass growing .................................................. (c) Other cultivation- 1st class ............................... 2nd class ..............................(d) Temporary building erected on area (a), (b) or (c) ................................................................... $1250 per hectare per annum $250 per hectare per annum $1250 per hectare per annum $625 per hectare per annum $1.00 per sq. metre per annum (Minimum fee $20 per annum) (L.N. 320 of 1976) 2. Drying Ground (including any building permitted thereon) ............................................................... 1/4 of Urban Area Standard Rate 3. (Repealed 17 of 2003 s. 12) 4. Filling Station (including any building permitted thereon and any tank associated therewith)- (a) One outlet- (i) Central Town ........................................... (ii) Town ...................................................... (iii) Suburb ..................................................... (iv) Country ....................................................(b) Each additional outlet ........................................ $3000 per annum $2500 per annum $2000 per annum $1500 per annum $500 per annum 5. Government building (including any land connected therewith) .............................................................. Open market rental value 6. Harbour service kiosk ............................................ $120 per annum 7. Military encroachment ............................................ $1.00 per annum 8. Miscellaneous encroachment considered by the Authority to be of a minor nature ............................ $20 per annum 9. Non-profit-making, charitable and welfare purposes (including any building permitted thereon) ................ $10 per annum 10. Pier .............................................................................. 1/4 of Urban Area Standard Rate 11. Playground (including any building permitted thereon)....... $250 per annum 12. Removal permit (for removal of earth, turf or stone)........ Variable rate, as determined by the Authority 13. Shipbreaking .................................................................. $10 per ship per day (Minimum fee $250) 14. Slipway ......................................................................... 1/4 of Urban Area Standard Rate 15. Utility- (a) Poles (for overhead lines), underground cables and mains........................................................ (b) Pylons (for overhead lines) having an envelope area being an area of land used for the base and foundations of the pylon tower including any additional area of land overhung by any structures or fixtures attached to the pylon tower ............. (c) Any pipeline or cable laid through Government tunnels ...................................................................................... No fee. $10 per sq. metre of pylon envelope area per annum $6 per 10 mm diameter per metre per annum. (L.N. 32 of 1989) 16. Vehicle Parking- (a) Covered- (i) not exceeding 60 m2 ............................. (ii) exceeding 60 m2 ...................................(b) Open (including any building permitted thereon not exceeding 10 m2) ................................................................. 1/4 of Urban Area Standard Rate Urban Area Standard Rate 1/8 of Urban Area Standard Rate (L.N. 320 of 1976) 17. Water Supply (including intakes, pipelines, wells, reservoirs, pumphouses, etc.)- (a) Agricultural ...................................................... (b) Domestic, industrial and commercial .................. $20 per annum per installation $100 per annum per installation 18. Works Contract (area occupied in connection with a Public Works Contract) ......................................... |