|
[接上页] No fee 19. Dumping .............................................................. No fee (L.N. 33 of 1974) Cap 28A Sched 2 [regulation 3] PART I NEW TERRITORIES STANDARD RATE 30 cents per sq. metre per annum PART II SPECIAL RATES Item Purpose Fee 1. Cultivation- (a) Pleasure Garden ....................................... (b) Unimproved grazing and grass cutting ......... (c) Cultivation (including flower and grass growing, fish pond, threshing floor, salt pan and like use) ............................................. (d) Temporary building erected on (a), (b) or (c) $1250 per hectare per annum 50 cents per hectare or part thereof per annum $20 per hectare per annum 30 cents per sq. metre per annum (L.N. 320 of 1976) 2. Drying Ground (including any building permitted thereon) ......................................................... $1250 per hectare per annum (L.N. 320 of 1976) 3. (Repealed 17 of 2003 s. 13) 4. Filling Station (including any building permitted thereon and any tank associated therewith)- (a) One outlet ................................................. (b) Each additional outlet ................................. $1500.00 per annum $500 per annum 5. Government building (including any land connected therewith) ..................................... Open market rental value 6. Military encroachment..................................... $1.00 per annum 7. Miscellaneous encroachment considered by the Authority to be of a minor nature ..................... $10.00 per annum 8. Motor boat service kiosk ................................. $120.00 per annum 9. Non-profit-making, charitable and welfare purposes (including any building permitted thereon) ......................................................... $1.00 per annum 10. Pier or slipway ............................................... 10 cents per sq. metre per annum (L.N. 320 of 1976) 11. Playground (including any building permitted thereon) ...................................................... $250.00 per annum 12. Removal permit (for removal of earth, turf or stone) ........................................................... Variable rate, as determined by the Authority 13. Shipbreaking ................................................... $10.00 per ship per day (Minimum fee $250.00) 14. Utility- (a) Poles (for overhead lines), underground cables and mains ...................................... (b) Pylons (for overhead lines) having an envelope area being an area of land used for the base and foundations of the pylon tower including any additional area of land overhung by any structures or fixtures attached to the pylon tower ........................ (c) Any pipeline or cable laid through Government tunnels ................................... No fee $10 per sq. metre of pylon envelope area per annum $6 per 10 mm diameter per metre per annum (L.N. 32 of 1989) 15. Vehicle Parking- (a) Covered .................................................. (b) Open (including any building thereon not exceeding 10 m2) ...................................... 30 cents per sq. metre per annum 10 cents per sq. metre per annum (L.N. 320 of 1976) 16. Water Supply (including intakes, pipelines, wells, reservoirs, pumphouses)- (a) Agricultural ............................................... (b) Domestic .................................................. (c) Industrial and commercial .......................... $10.00 per annum per installation $25.00 per annum per installation $50.00 per annum per installation 17. Works Contract (area occupied in connection with a Public Works Contract) ......................... No fee 18. Dumping ....................................................... No fee (L.N. 33 of 1974) Cap 28A Sched 3 FEES [regulation 3A] PART I FEES PAYABLE IN RESPECT OF EXCAVATION PERMITS RELATING TO EXCAVATIONS IN UNLEASED LAND WHICH IS A STREET MAINTAINED BY THE HIGHWAYS DEPARTMENT Item Description Fee 1. Issue or deemed issue of an excavation permit referred to in sections 10A(1) and 10D(2) of the Ordinance................................................................. $1860 plus a daily fee of $32 per day for the whole duration of the excavation permit 2. Extension in respect of an excavation permit referred to in sections 10A(3) and 10D(4) of the Ordinance.................................................................. (a) $590 plus a daily fee of $32 per day for the whole duration of the extended period; and (b) economic costs in the following scale for the whole duration of the extended period— (i) $18000 per day for a strategic street; (ii) $7000 per day for a sensitive street; (iii) $1500 per day for a remaining street. PART II FEES PAYABLE IN RESPECT OF EXCAVATION PERMITS RELATING TO EXCAVATIONS IN UNLEASED LAND, OTHER THAN STREETS MAINTAINED BY THE HIGHWAYS DEPARTMENT Item Description Fee 1. Issue of an excavation permit referred to in section 10A(1) of the Ordinance......................................................................... $3060 2. Extension in respect of an excavation permit referred to in section 10A(3) of the Ordinance.............................................. $400 PART III FEES PAYABLE IN RESPECT OF EMERGENCY EXCAVATIONS IN UNLEASED LAND WHICH IS A STREET MAINTAINED BY THE HIGHWAYS DEPARTMENT Item Description Fee 1. Emergency excavation made or maintained during the initial period referred to in section 10C(4) of the Ordinance................ $1860 plus a daily fee of $32 per day for the whole duration of the emergency excavation determined in accordance with section 10C(5) (Schedule 3 added 17 of 2003 s. 14) |