第3页 IMPLEMENTING ARRANGEMENT NUMBER 1 TO THE AGREEMENT BETWEEN THE TAIPEI ECONOMIC AND CULTURAL REPRESENTATIVE OFFICE IN THE UNITED STATES AND THE AMERICAN INSTITUTE IN TAIWAN FOR TECHNICAL COOPERATION ASSOCIATED WITH DEVELOPMENT, LAUNCH AND OPERATION OF A C

[接上页]

  Exhibits to this Implementing Arrangement [all Exhibits areof equal precedence]:
  
  Exhibit A-Milestion Completion Certificate
  
  Exhibit B-All Work Completion Certificate
  
  Appendices to this Implementing Arrangement:
  
  Appendix ⅠCost Estimate
  
  Appendix ⅡFunding Profile
  
  Appendix ⅢStatement of Work
  
  Appendix ⅣRequirements
  
  Appendix ⅤData Deliverables
  
  Appendix ⅥUCAR's Execution Plan Proposal
  
  Article 4 - The Launch
  
  4.1 The Launch period shall be the three - month period commenc-ing from a date within the 4znd month to the 45th month fromthe Work Starting Date under the ROCSAT-3/COSMIC SpacecraftContract.
  
  4.2 The Launch Slot within the Launch Period shall be determinedby mutual agreement of the parties' designated representati-ves no later than six (6) months prior to the first day ofthe Launch Period, taking into account the available LaunchOpportunities.
  
  4.3 The Launch Day (defined as the calendar day within the Laun-ch Slot during which the Launch Windows in open)shall be de-termined by mutual agreement of the parties' designated rep-resentatives no Later than two (2) months prior to the firstday of the Launch Slot, taking into account the available L-aunch opportunities. Launch Opportunities are defined as theopportunities available for a launch within a Launch Periodor a Launch Slot depending on the availability and scheduli-ng of facilities at the Launch Site, and meteorological andtechnical considerations. Launch is defined as the ignitionof the First - stage motor (s) of the Launch Vehicle that h-as been integrated with the satellite with the intention tocomplete the Launch Mission. The launch Mission is definedas the transport into the prescribed orbit of the satellitesby means of the designated Launch Vehicle from the surfaceof the earth.
  
  4.4 The Launch Time (defined as the scheduled time for Launch d-efined in hours, minutes and seconds of Universal Time) wit-hin the Launch Windows on the launch Day, shall be determin-ed by mutual agreement of the parties' designated represent-ative, NSPO and UCAR, no later than one (1) day after the s-uccessful completion of the Launch Readiness Review. The La-unch Windows in defined as the daily period of time withineach of one or more potential launch Days during which theLaunch can occur in order to achieve the launch Mission.
  
  4.5 In the event the scheduled launch Day is delayed after it isdetermined pursuant to the procedure set forth above, RSLPmay have to incur additional costs.
  
  TECRO's designated representative, NSPO, shall be responsib-le for any additional costs resulting from delays attributa-ble to NSPO or its contractors. AIT's designated representa-tive, UCAR, shall be responsible for any additional costs r-esulting from delays attributable to UCAR or RSLP. Each des-ignated representative, NSPO and UCAR, shall bear the conse-quences of force majeure event (s) suffered by it.
  
  4.6 Title to the Launch vehicle, defined as the Orbital Suborbi-tal Program Space Launch Vehicle (OSPSLV), Minotaur, furmis-hed by RSLP for COSMIC, shall not be transferred to NSPO.
  
  4.7 RSLP has the right to intentionally desltroy the Launch Veh-icle, including the satellites and payloads, for range safe-ty purposes. In such event, NSPO shall not be responsible f-or consequences thereof.
  
  4.8 NSPO sahll not be responsible for any property damage or bo-dily injury sustained by UCAR, RSLP and/or their contractorsor personnel or any third party resulting from the launch.Article 5 - Milestone Achievement and Completion of the Work5.1 Upon completion of all tasks and document submissions requi-red in this Implementing Arrangement for each milestone, AIT's designated representative, UCAR, shall issue a MilestoneCompletion Certificate (MCC) in the from of Exhibit A, Cert-ifying that all required milestone tasks, inclusive of allpreceding milestone tasks, have been successfully completedand that no default under this Implementing Arrangement hasoccurred or is continuing.
  
  The Program Manager for TECRO's designated representative,NSPO, shall, within fifteen (15) days after receipt of theMilestone Completion Certificate issued by UCAR, either cou-ntersign the Milestone Completion Certificate to certify thesuccessful completion of each milestone or state the itemswhich do not comply with the requirements of this Implement-ing Arrangement. In the event the NSPO Program Manager demo-nstrates any non-compliance, UCAR shall make a best effortto correct for any resulting schedule impact.
  
  The date on which the NSPO Program Manager countersigns therespective Milestion Completion Certificate shall denote thesuccessful completion date for such milestone.
  
  5.2 Upon successful completion of all the tasks required underthis Implementing Arrangement, UCAR shall issue an All WorkCompletion Certificate (AWCC) in the form of Exhibite B forcountersigning by NSPO.
  
  The approval or countersigning by NSPO of any MCC or docume-nt submittals in respect of any part of the milestones shallnot release UCAR from any responsibility for the final comp-letion of all the task in accordance with this ImplementingArrangement.