您所在位置:法邦网 > 法律法规 > 法规浏览

管理我的法规库

哇,我可以拥有自己的法规库!

法规提交

如果您发现我们没有收录到的法规,您可以在此提交。提交后我们会即时把它收录上,感谢您参与维护我们共同的法规库。
【法规名称】 
【颁布时间】 2002-05-14
【法规编号】 43385  什么是编号?
【正  文】

第6页 IMPLEMENTING ARRANGEMENT NUMBER 1 TO THE AGREEMENT BETWEEN THE TAIPEI ECONOMIC AND CULTURAL REPRESENTATIVE OFFICE IN THE UNITED STATES AND THE AMERICAN INSTITUTE IN TAIWAN FOR TECHNICAL COOPERATION ASSOCIATED WITH DEVELOPMENT, LAUNCH AND OPERATION OF A C

[接上页]

  University Corporation for Atmospheric Research
  
  P.O.Box 3000
  
  Boulder, CO 80307-3000
  
  Telephone No:303-497-8890
  
  Facsimile No:303-497-8501
  
  Attention:Mr. Jeff Reaces
  
  10.2 TECRO and AIT's designated representatives, NSPO and UCAR,repspectively, will coordinate with each other and UCAR wi-ll coordinate with ONR and STP on all public release of in-formation raegrding integration and COSMIC space flight op-erations. Public release of any information associated withthis mission will be in compliance with existing DoD direc-tives and security classification guides. Guidance relatedto these requirements will be provided to NSPO by UCAR on
  
  later than WSD.
  
  In any release of information relating to the COSMIC Missi-on such release shall include a statement to the effect th-at the COSMIC Project of effort depicted was or is jointlysponsored by NSPO, the DoD Space Test Program and SMC/TEB
  
  of the US Air Force.
  
  For the purpose of this clause, "Information" includes, butis not limited to news releases, articles, manuscripts, br-ochures, advertisements, still and motion pictures, speech-es, trade association meetings, symposia, etc.
  
  Nothing in the foregoing shall affect compliance with USAF,ONR, and STP security requirements.
  
  Article 11 - Effective Date
  
  This Implementing Arrangement will become effective on the dateof the last signature hereafer. Within seven (7) days after theeffective date of this Implementing Arrangement, TECRO's design-ated representative. NSPO, will notify AIt's designated represe-ntative, UCAR, in writing of the Work Start Date (WSD). UCAR wi-ll proceed with the work on the designated Work Start Date.Article 12 - Amendment
  
  This Implementing Arrangement shall only be amended or modifiedin writing signed by the authorized representatives of the TECROand AIT. Oral direction will not modify or change the provisionsof this Implementing Arrangement.
  
  Article 13 - Termination / Rescission
  
  13.1 Termination for convenience
  
  After consultation with its designated representative, NSPO,TECRO may, for its convenience, terminate this Implementi-ng Arrangement in whole or in part by a prior written noti-ce of no less than fourteen (14) days to AIt and its desig-nated representative, CUAR, specifying the extent to whichperformance of work under this Implementing Arrangement isterminated and the date on which such termination becomes
  
  effective. AIT's designated representative, UCAR, shall wi-thout delay stop the work so terminated.
  
  After consultation with its designated representative, UCA-R, AIT may, for its convenicence, terminate this Implement-ing Arrangement by a prior written notice of no less than
  
  fourteen (14) days to TECRO and its designated representat-tive, NSPO, specifying the date on which such termination
  
  becomes effective, provided that the USAF has issued a not-ice of termination to UCAR under the RSLP MOA for one of t-he following reasons:
  
  1 Failure to receive funding in accordance with the paymentschedule set forth in the RSLP MOA.
  
  2 Rescission of the authorization granted by the U.S. Depa-rtment of State for the use of Minotaur for the ROCSAT-3/
  
  COSMIC Program, as set forth in the TAA.
  
  3 Rescission of the authorization granted by the U.S. Depa-rtment of Defencse for the use of Minotaur for the ROCSAT
  
  -3/COSMIC Program.
  
  AIT will provide TECRO, and its designated representative,NSPO, with the official termination notice issued by the U-SAF In the event the amount of NSPO's contribution then ma-de exceeds the total cost incurred by RSLP, UCAR shall ref-und through AIT and TECRO to NSPO within thirty (30) days
  
  from the effective date of the termination the amount of N-SPO's contribution then made, less and amount representingNSPO's shere of cost for the Launch (as so certified by RS-LP based on the items set forth in Appendix I, the Cost Es-timate) according to the actual deobligation and rembursem-ent formula used by the USAF, which is expected to be base-d on the ratio of the cumulative contributions of NSPO andSTP then made for the Launch. The USAF has agreed to use i-ts best efforts to maintain thisratio. In the event TECR-O terminates this Implementing Arrangement for its conveni-ence or the reason the USAF terminaties the RSLP MOA is fa-ilure of NSPO to provide funding to UCAR for more than thi-rty (30) days beyond the payment schedule set forth in theAppendix Ⅱ funding profile, as stated in the official ter-mination notice issued by the USAF, and the amount of NSP-O's contribution then made is less than the total cost inc-urred by RSLP from NSPO's account, then NSPO shall remit t-hrough TECRO and AIT the difference up to the total cost i-ncurred by RSLP from NSPO's account.
  
  13.2 Rescission
  
  The occurerence of any of the following events shall const-itute default of AIT's designated representative, UCAR, un-der this Implementing Arrangement. After consultation withits designated representative, NSPO, TECRO may,after edxpi-ration of the applicable time period as stipulated in para-graphs a to d below, immediately rescind this ImplementingArrangement in whole or in part:
此法规有错误,我来纠正。请点击在此 提交错误内容或者您纠正的内容!
回到顶部
法规搜索:
法律法规  Copyright ©2007-2019 Fabao365.com 版权所有
|
京ICP备10210683号
|
京公网安备11010802013176号
|
客服电话:15811286610