第3页 IMPLEMENTING ARRANGEMENT NUMBER 5 ACCEPTANCE TESTING OF AN ADVANCED OPERATIONAL AVIATION WEATHER SYSTEM (AOAWS) TO THE AGREEMENT BETWEEN THE TAIPEI ECONOMIC AND CULTURAL REPRESENTATIVE OFFICE IN THE UNITED STATES AND THE AMERICAN INSTITUTE IN TAIWAN FOR

[接上页]

  Task #1 forcuses on the completion of the AOAWS System softwareincluding the Mulitidimensional Display System (MDS), System Mo-nitor Dispaly (SMD), Web Multidimensional Display System (WMDS),Mode Display, data servers, and weather products.
  
  A focus of FY2002 is to perform internal testing of the AOAWS S-ystem in preparation of formal site acceptance (SAT) and reliba-ility acceptance testing (RAT), which will be performed mid yearin FY2002. Immediately following the successful completion of t-he RAT, a 12-month warrantey and maintenance period will begin.A user metting will also be conducted to discuss and review theAOAWS system capabilities.
  
  The AOAWS Acceptance Test plan Proposal, which was drfted in FY2001, will be completed early in the year and it will be used asUigdance during the testing pocess. An AOAWS test readiness rev-iew meeting will be held just prior to the start of the SAT. Thetest readiness review will be used to identify and outstandingissues or concerns of TECRO's dseignated representative, the CAA, and for reviewing test procedures and daily test schedule. St-aff from the AOAWS devlopment team will be present during the S-AT and RAT period.
  
  AOAWS System user manuals will also be preared and finalized aspart of Task #1. Draft versions of the user monuals will be madeavailable to TECRO's designated representative, the CAA, for re-view and feedback during the prepartion period. Te user manualswill include:
  
  〇MDS User Manual
  
  〇WMDS User manual
  
  〇SMD User Manual
  
  〇Model Display User manual
  
  〇MM5 System operation Manual
  
  〇AOAWS System Operation Manual
  
  〇Software installation Manual
  
  The MM5 System adn AOAWs System operation manuals will include,but are not lmited t, information about; system startup and shu-tdown procdures, hardware and network configuration, process ar-chitecture, data ingest, data export, archival, configuration f-iles, and troubleshooting. The user manuals will be provided inboth English and Chinese and may be combined, where appropriate.A series of training sessions will be provded to AOAWs system u-sers and operators throughout the year so they can become famil-iar with the latest version of the system. The training sessionswill be coordinated and scheduled with input from TECRO's desig-nated representative, the CAA.
  
  The system implementation, testing, and maintenance task includ-es the folowing subtasks:
  
  .Supporting and maintaining the AOAWS software during the test-ing process and during the maintenance and warranty period.
  
  .Completing the AOAWS Acceptance Test Plan proposa.
  
  .Performing internal testing of the AOAWs System prior to theformal acceptance testing process.
  
  .Installing version-4.0 AOAWS software prior to the start of t-he acceptance testing.
  
  .Performing and participating in the SAT and RAT.
  
  .Completing the AOAWS user Manuals (English andChinese).
  
  .Conducting AOAWs user training.
  
  .Providing AOAWS warranty and maintenance services.
  
  Deliverables:
  
  .AOAWs Acceptance Test Plan Proposal 15 March 2002
  
  .Complete AOAWS Sit Acceptance Test26 April 2002
  
  .Complete AOAWS Reliability Acceptance Test3 June 2002
  
  .AOAWs User manuals (Chinese & English)14 June 2002〇MDS User Manual
  
  〇WMDS User Manual
  
  〇SMD User Manual
  
  〇MM5 System Operation Manual
  
  〇AOAWS System operation Manual
  
  〇Software Installation Manual
  
  Resources Required:
  
  1Staff:
  
  Software engineering (0.5 FTE)US$ 55,461Systems Administration (0.5 FTE)US$ 38,789Systems Management (0.2 FTE)US$ 42,675Travel:
  
  TAMC lab support (1 person-trip @1-week)US$7,800Acceptance testing support (1 person-trip @2-weeks) US$9,775─────
  
  Task TotalUS$154,4252.2 Task #2- MM5 System Completion, Testing, and Maintenance
  
  Part A:The development of the MM5 forecast system will be compl-eted in FY2002. The final version of the MM5 system will be dev-eloped and tested at uCAR, AIT's designated representative. Aft-er internal testing, the system software will be ported to theAOAWs computing environment at the CWB, CAA's cooperative parti-ner, installed, configured, run, and finalized.
  
  MM5 forecast system work during FY2202 will consist of:(i) comp-leting the development of the 135/45/15/5-km MM5 configuration (including 3DVAR) with a 3-hourly forecast frequency, (ii) upgra-ding the new configuraton MM5 system on the Fujitsu supercomput-er of CWB, CAA's cooperative partner, (iii) running, monitoring,tuning, and finalizing the MM5 system at CWB, and (iv) maintain-ing the system throughout the warranty period. in addition, theMM5 system monitoring capability will be enhanced.
  
  The development of the MM5 system will involve constructing andtesting a 5-km/3-hourly system at UCAR, AIt's designated repres-entative. The scripts and codes necessary for data ingest, first-guess ingest, preprocessing, processing, and post processing w-ill be prepared, tested, and revised where necessary. The workwill also entail modifying the model display systme to accommod-ate the new 5-km grid, its outupt, and the new 3-hourly forecastfrequency.