[接上页] (c) Survey of navigational and life-saving appliances except inflatable life rafts 1/5 of the appropriate survey fee under item 2 or the sum of the fees for the items surveyed, whichever is the less. 11. For a partial survey of the hull, the machinery or the safety equipment of ships holding valid passenger certificates following a reported accident or casualty. Per visit subsequent to the initial visit by a surveyor 4425 SECTION B-EXAMINATION AND APPROVAL OF PLANS Note: (1) The fee charged for examination and approval of plans is additional to any prescribed fee for survey or for witnessing of tests, except initial surveys for registry. (2) Where work on the examination and approval of plans is done for which a fee is not prescribed, the fee charged will be determined by the Director in agreement with the applicant, having regard to the nature and extent of the work involved. 1. For the examination of the design of any type of fire detecting system or plans of any type of installation for fire extinguishing ) ) ) 2. For the examination of structural drawing and scantlings ) 3. For the consideration of the watertight subdivision arrangements ) ) 4. For the consideration of the fire protection arrangements ) a fee determined by the time involved, charged at the hourly rate. 5. For the consideration of designs of boilers or shafting, or other machinery parts ) ) 6. For the consideration of the arrangement of fire appliances, life-saving appliances, navigation lights and sound signals or navigational equipment ) ) ) 7. For the examination of the design of side-scuttles, or fire-resisting doors, or ships' side or other hull fittings ) ) 8. For the examination of designs of fittings intended for use in connection with the subdivision or structure of a ship ) ) 9. For the consideration of the arrangement of radio-telegraphy installations ) ) SECTION C-SURVEYS OF BOILERS AND MACHINERY Purpose or service Fee $ The following fees shall be payable- 1. For the survey and hydraulic testing of boilers intended for use on board ship ) ) 2. For the survey of boiler parts, machinery, etc.- ) (a) Air receivers or welded pressure vessels of Class I and II ) ) (b) Air receivers or welded pressure vessels of Class III ) (c) Auxiliary unit (such as evaporators, heaters, filters, coolers, pumps and other similar items) ) ) (d) Boiler mountings ) (e) Electric generators and motors ) (f) Main switchboard tests ) 3. For survey of engines (including turbines) steam or internal combustion ) ) 4. For survey of machinery items, gearing, shafting, propellers and other similar items ) ) 5. For survey of oil fuel installations, tanks, cofferdams and oily water separators, pressure gauges and other similar items ) ) ) 6. For survey of steering gear- ) Steering gear, main and auxiliary, complete ) 7. For survey of superheaters for boilers ) 8. For survey of watertight doors - ) (a) Examination of design, inspection and witnessing of tests of the prototype and issue of a certificate of inspection and tests where appropriate ) ) ) a fee determined by the time involved, charge at the hourly rate. (b) Watertight doors of an approved design ) 9. For survey of bars, plates or rivets, witnessing tensile and bend tests ) ) 10. For survey of boilers and superheater tubes subject to internal or external pressure, inspection, hydraulic and ductility tests ) ) ) 11. For survey of castings or forgings for stem, stern post rudder or propeller, inspection and tests ) ) 12. For survey of engine casting and forging, superheater headers or similar items, inspection and material tests ) ) 13. For witnessing tests of a new electrode intended for use on parts of ships' hulls which are of primary structural importance ) ) ) 14. For survey of the finished work of flanged or worked plates, compensation rings, and manhole doors ) ) 15. For survey of furnaces and witnessing material tests ) 16. For survey of steam and feed pipes and witnessing material tests ) ) 17. For the inspection and verification of testing machines used for testing materials coming under Government survey and for the issue of a certificate- ) ) ) (a) For inspection and verification for first issue of a certificate ) ) (b) For inspection and verification for renewal of a certificate 5885 18. For a certificate of inspection, or certificates of material or hydraulic test, in duplicate 3685 SECTION D-CARGO SHIP SAFETY CONSTRUCTION CERTIFICATES The following fees shall be payable- 1. Standard Fees for Cargo Ship Safety Construction Surveys and Certificates- Gross Tonnage of Ship Issue of Certificate $ Renewal of Certificate $ Intermediate or Periodical Survey $ 500 tons and under 1000 tons 97860 plus $12245 for each 100 tons or part thereof by which the ship exceeds 500 tons 22025 5885 1000 tons and under 15000 tons 195725 plus $44045 for each 500 tons or part thereof by which the ship exceeds 1000 tons |