您所在位置:法邦网 > 法律法规 > 法规浏览

管理我的法规库

哇,我可以拥有自己的法规库!

法规提交

如果您发现我们没有收录到的法规,您可以在此提交。提交后我们会即时把它收录上,感谢您参与维护我们共同的法规库。
【法规名称】 
【法规编号】 79809  什么是编号?
【正  文】

第9页 CAP 123A BUILDING (ADMINISTRATION) REGULATIONS

[接上页]

  (a) the demolition works have been completed in accordance with the approved plans;
  
  (b) any structure or building remaining on the site is, in his opinion, structurally safe; and
  
  (c) any land or street affected by the demolition works has an adequate margin of safety. (L.N. 514 of 1997)
  
  (L.N. 188 of 1974; L.N. 347 of 1993; L.N. 514 of 1997)
  
  Cap 123A reg 25A Certificates as to supply of water
  
  (1) On the completion of any new building in which any water closet fitment, trough water closet, latrine fitment or urinal has been provided in accordance with the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations (Cap 123 sub. leg. I), the authorized person appointed in respect of the building works shall send to the Building Authority together with the certificate referred to in regulation 25(2)-
  
  (a) a certificate by the water authority to the effect that a permanent connexion to the building of a supply of water from the waterworks has been made in accordance with regulation 10A of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations (Cap 123 sub. leg. I);
  
  (b) where the Building Authority has under regulation 10A(3)(b) of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations (Cap 123 sub. leg. I) permitted the connexion to the building of a supply of water from a well within the site of the building-
  
  (i) a certificate by the authorized person appointed in respect of the building works to the effect that a permanent connexion to the building of a supply of water from a well within the site of the building has been made in accordance with regulation 10A of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations (Cap 123 sub. leg. I); and
  
  (ii) a certificate by the authorized person appointed in respect of the building works in respect of such well in accordance with regulation 10A(7) of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations (Cap 123 sub. leg. I); or (L.N. 439 of 1990)(c) where the Building Authority has under regulation 10A(3)(c) of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations (Cap 123 sub. leg. I) permitted or directed the connexion to the building of a supply of water other than a supply of water from the waterworks or from a well within the site of the building, a certificate from the authorized person appointed in respect of the building works to the effect that a permanent connexion to the building of such supply has been made in accordance with regulation 10A of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations (Cap 123 sub. leg. I).(2) On the completion of any new building in which any waste fitment or shower has been provided in accordance with the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations (Cap 123 sub. leg. I), the authorized person appointed in respect of the building works shall send to the Building Authority together with the certificate referred to in regulation 25(2)-
  
  (a) a certificate from the water authority to the effect that a permanent connexion to the building of a supply of water from the waterworks has been made in accordance with regulation 10A of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations (Cap 123 sub. leg. I);
  
  (b) where the Building Authority has under regulation 10A(3)(b) of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations (Cap 123 sub. leg. I) permitted the connexion to the building of a supply of water from a well within the site of the building-
  
  (i) a certificate by the authorized person appointed in respect of the building works to the effect that a permanent connexion to the building of a supply of water from a well within the site of the building has been made in accordance with regulation 10A of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations (Cap 123 sub. leg. I); and
  
  (ii) a certificate by the authorized person appointed in respect of the building works in respect of such well in accordance with regulation 10A(7) of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations (Cap 123 sub. leg. I); or (L.N. 439 of 1990)(c) where the Building Authority has under regulation 10A(3)(c) of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations (Cap 123 sub. leg. I) permitted or directed the connexion to the building of a supply of water other than a supply of water from the waterworks or from a well within the site of the building, a certificate by the authorized person appointed in respect of the building works to the effect that a permanent connexion to the building of such supply has been made in accordance with regulation 10A of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations (Cap 123 sub. leg. I).(3) The water authority shall issue a certificate required under this regulation within 10 days of receiving an application in writing therefor.
此法规有错误,我来纠正。请点击在此 提交错误内容或者您纠正的内容!
回到顶部
法规搜索:
法律法规  Copyright ©2007-2019 Fabao365.com 版权所有
|
京ICP备10210683号
|
京公网安备11010802013176号
|
客服电话:15811286610