|
[接上页] (3) The Authority shall give notice in the Gazette of the publication of any advice given under subsection (1) in the form of a Code of Practice. (Added 87 of 1988 s. 11) Cap 56 s 19 Authority to be notified of pressurized fuel containers that are being used Remarks: not yet in operation Pressurized fuel containers (Amended 87 of 1988 s. 32) (1) Within 30 days after a new pressurized fuel container is first put into use, the owner of the pressurized fuel container shall notify the Authority that it has been put into use and of the place at which it is being used and shall also notify the Authority of his address. (2) Within 6 months after the commencement of this section, the owner of an existing pressurized fuel container shall notify the Authority of the place at which it is being used and of his address. (Amended 87 of 1988 ss. 31 & 36) Cap 56 s 20 Registration of pressurized fuel containers, etc. Remarks: not yet in operation (1) The Authority shall enter in the register of pressurized fuel containers every pressurized fuel container in respect of which he receives notice under section 19 and may enter in the register any other pressurized fuel container whose existence comes to his notice if the same is being used. (2) The Authority shall allot a registration number to every pressurize fuel container that he enters in the register of pressurized fuel containers an shall, wherever practicable, notify the owner of the pressurized fuel container of the number so allotted. (3) The owner of a pressurized fuel container shall cause the registration number thereof, notified by the Authority under subsection (2), to be engraved, whether by impression or incision, in a conspicuous position on the pressurize fuel container and to be clearly legible at all times. (Replaced 60 of 1967 s. 5) (Amended 87 of 1988 ss. 31, 32 & 36) Cap 56 s 21 Authority to be notified of sale of pressurized fuel container, etc. Remarks: not yet in operation (1) The owner of a registered pressurized fuel container who sells the same shall, within 7 days after the sale, notify the Authority of the name an address of the person to whom it has been sold. (2) The owner of a registered pressurized fuel container shall, within 7 days after the change, notify the Authority of any change in the place at which he is using the pressurized fuel container or in his address. (Amended 87 of 1988 ss. 31 & 36) Cap 56 s 22 Maintenance of boilers and pressure vessels, boiler-houses and fire-fighting appliances, etc. PART IV MAINTENANCE AND EXAMINATION OF BOILERS, PRESSURE VESSELS AND STEAM CONTAINERS, AND CONTROL OF USE AND OPERATION THEREOF (Amended 87 of 1988 s. 34) (1) Every boiler and pressure vessel and its auxiliary equipment shall be properly maintained. (Amended 87 of 1988 s. 33) (2) Every steam container shall be so maintained that the outlet therefrom is, at all times, open and free from obstruction. (3) Without prejudice to the generality of the provisions of subsection (1), every fitting and storage tank connected with a fuel burning installation shall be free from defective joints. (4) Every place in which a boiler is situated shall be maintained in a clean condition and free from any waste inflammable material. (5) Every appliance provided in connection with a boiler or its auxiliary equipment for use in combatting an outbreak of fire shall be properly maintained and situated in a readily accessible place. Cap 56 s 23 (Repealed 67 of 1978 s. 14) Cap 56 s 24 New boilers and pressure vessels to be examined before being put into use (1) Upon completion of the installation of a new boiler or pressure vessel, other than an air receiver, and before the same is put into use, the boiler or pressure vessel and its auxiliary equipment shall be examined by an appointed examiner. (Amended 87 of 1988 s. 12) (2) Every new air receiver, other than a pressurized fuel container, and its fittings and attachments shall be examined by an appointed examiner before it is put into use. (Amended 87 of 1988 s. 31) Cap 56 s 25 Boilers and steam receivers to be used in new premises to be examined before being put into use Every boiler or steam receiver that is to be put into use in premises other than those in which it was previously used shall, together with its auxiliary equipment, be examined by an appointed examiner before it is put into use in such premises. Cap 56 s 26 Boilers and pressure vessels to which extensive repairs, etc. have been made to be examined before being again put into use (1) Every boiler or steam receiver in respect of which extensive repairs have been carried out or, save where the same is designed so as to be transportable from one place to another, that has been removed from one part of any premises to another part thereof shall, together with its auxiliary equipment, be examined by an appointed examiner before it is again put into use. (2) Every air receiver, other than a pressurized fuel container, in respect of which extensive repairs have been carried out or, save where the same is designed so as to be transportable from one place to another, that has been removed from one part of any premises to another part thereof shall, together with its fittings and attachments, be examined by an appointed examiner before it is again put into use. (Amended 87 of 1988 s. 31) |