第9页 CAP 56 BOILERS AND PRESSURE VESSELS ORDINANCE

[接上页]

  Cap 56 s 27 Periodic examination of boilers and pressure vessels
  
  (1) Save as otherwise provided-
  
  (a) a boiler, other than a boiler to which paragraph (b) applies, shall be examined by an appointed examiner within 14 months after the date of any certificate of fitness issued in respect thereof; and
  
  (b) the following shall be examined by an appointed examiner within 26 months after the date of any certificate of fitness issued in respect thereof-
  
  (i) any boiler to which this paragraph applies, in the case of which a period of 21 years has not expired since it was first taken into use;
  
  (ii) any air receiver, other than a pressurized fuel container; and (Amended 87 of 1988 s. 31)
  
  (iii) any steam receiver.(2) Subsection (1)(b) shall apply to a boiler of any of the following kinds-
  
  (a) a water tube boiler of which the drums and any headers are of fusion welded or solid forged construction and which has an evaporative capacity of not less than 22 000 kilograms of steam per hour; (Amended 67 of 1978 s. 15; 87 of 1988 s. 13)
  
  (b) a boiler in a group of water tube boilers of which the drums and any headers are of fusion welded or solid forged construction, being a group in which-
  
  (i) each boiler has an evaporative capacity of not less than 11 000 kilograms of steam per hour; and
  
  (ii) the total evaporative capacity of all the boilers is not less than 45 000 kilograms of steam per hour; and (Amended 67 of 1978 s. 15; 87 of 1988 s. 13)(c) a boiler which is a waste heat boiler or heat exchanger with fusion welded longitudinal and circumferential seams, or a super-heater of fusion welded construction, and which is an integral part of a continuous flow installation in a chemical or oil refinery processing plant.(2A) Where-
  
  (a) the Authority is satisfied that a boiler or pressure vessel cannot, because of operational requirements, be shut down for an examination required by subsection (1); and
  
  (b) an appointed examiner has examined the boiler or pressure vessel while operating and is satisfied that it could continue to operate safely beyond the period within which the boiler or pressure vessel must be examined under subsection (1),the Authority may, by notice in writing to the owner, extend that period for no more than 6 months and, if he does so, the relevant certificate of fitness shall remain in force until the end of that extended period. (Added 87 of 1988 s. 13)
  
  (2B) Where an appointed examiner or authorized officer issuing a certificate of fitness in respect of a boiler or pressure vessel considers that the boiler or pressure vessel should, in the interests of safety, be examined within a shorter period than that specified in subsection (1), he shall notify the Authority of that fact and the Authority may, by endorsement on the certificate, shorten the period. (Added 87 of 1988 s. 13)
  
  (3) For the purposes of this section-
  
  (a) "boiler" (锅炉) and "steam receiver" (蒸汽容器) include the auxiliary equipment of an such boiler or steam receiver;
  
  (b) "air receiver" (空气容器) includes the fittings and attachments thereof;
  
  (c) the date of a certificate of fitness shall, where different dates are entered therein in respect of different examinations and tests carried out, be deemed to be the date first in time of such dates.
  
  (Replaced 60 of 1967 s. 6)
  
  Cap 56 s 28 Examination of steam containers
  
  (1) Save as provided in subsection (2), every steam container shall be examined by a boiler inspector, in order to ensure that the outlet therefrom is open and free from obstruction, whenever the boiler that supplies steam thereto is examined in accordance with this Ordinance.
  
  (2) Every steam container shall be examined by a boiler inspector for the like purpose before it is put into use.
  
  Cap 56 s 29 Examination of new fuel burning installations and heaters fitted therein, etc.
  
  (1) Every new fuel burning installation shall be examined by an appointed examiner before it is put into use.
  
  (2) Every new heater fitted in a fuel burning installation shall, before it is put into use, be subjected by an appointed examiner to an hydraulic test, which shall be to not less than twice the maximum pressure to which the heater may be subjected when it is being used.
  
  (3) (a) Every pipe that is used for conveying fuel from a pump or gravity tank to the burners in a fuel burning installation and every fitting connected with any such pipe shall be tested by an appointed examiner-
  
  (i) in the case of a new such pipe, after the pipe has been jointed and before it is put into use; and
  
  (ii) in the case of any such pipe, within 7 days after the Authority so requires. (Amended 87 of 1988 s. 35)
  
  (b) Every such test shall be to-
  
  (i) twice the maximum pressure to which the fuel system is or will be subjected under normal working conditions; or
  
  (ii) the pressure specified in a recognized engineering standard or code. (Amended 87 of 1988 s. 30)
  
  Cap 56 s 30 Steam or water pipes to be hydraulically tested in certain cases
  
  Where-